Skip to content
▸ CHAS ELITE ▸ ISO 9001 / 14001 / 45001 ▸ CONSTRUCTIONLINE GOLD ▸ RIDDOR 0.0 — 3 YRS

Capability statement

We self-deliver the parts that go wrong.

Groundworks, concrete frame and drainage are ours — directly employed, directly supervised. Those three packages account for most of the programme risk on a typical scheme, which is exactly why we refuse to subcontract them.

01

Civil engineering

Highways, bridges, drainage and deep earthworks across the Midlands and South West.

Typical scope

  • ▸Highway and estate roads to adoption
  • ▸Bridge decks and structures
  • ▸SuDS and attenuation
  • ▸Bulk earthworks and cut/fill
02

Structural frames

Reinforced concrete, steel and cross-laminated timber, self-delivered.

Typical scope

  • ▸In-situ reinforced concrete
  • ▸Structural steel to 3,000t
  • ▸CLT and glulam frames
  • ▸Precast stairs and planks
03

Groundworks

Piling, substructure, remediation and enabling works on constrained sites.

Typical scope

  • ▸CFA and driven piling
  • ▸Contaminated land remediation
  • ▸Basement and retaining structures
  • ▸Temporary works design
04

Fit-out

Commercial, education and healthcare fit-out to CAT A and CAT B.

Typical scope

  • ▸CAT A and CAT B
  • ▸Healthcare to HTM standards
  • ▸Laboratory and clean spaces
  • ▸MEP coordination
05

Refurbishment

Listed and occupied buildings, including phased handover.

Typical scope

  • ▸Grade I and II listed
  • ▸Live, occupied environments
  • ▸Phased sectional completion
  • ▸Facade retention
06

Design & build

Single-point responsibility from RIBA Stage 2 through to handover.

Typical scope

  • ▸RIBA Stage 2 onwards
  • ▸Two-stage open book
  • ▸Full design team novation
  • ▸Single-point responsibility

Directly employed

Site operatives
214
Site management
38
Engineers & QS
29
Apprentices
17

Owned plant

360° excavators
31
Dumpers & rollers
44
Piling rigs
6
Tower cranes
9

Carbon & waste

2032

Net zero, scopes 1 & 2

98.4%

Waste diverted from landfill

71%

Plant on HVO or electric

-34%

Embodied carbon vs 2019

Bring us in at stage two.

Early contractor involvement is worth more than a competitive tender on most schemes. We will price it either way — but the buildability advice is free before the drawings are frozen.

Start a conversation