Skip to content
CHAS ELITE ISO 9001 / 14001 / 45001 CONSTRUCTIONLINE GOLD RIDDOR 0.0 — 3 YRS

Capability statement

We self-deliver the parts that go wrong.

Groundworks, concrete frame and drainage are ours — directly employed, directly supervised. Those three packages account for most of the programme risk on a typical scheme, which is exactly why we refuse to subcontract them.

01

Civil engineering

Highways, bridges, drainage and deep earthworks across the Midlands and South West.

Typical scope

  • Highway and estate roads to adoption
  • Bridge decks and structures
  • SuDS and attenuation
  • Bulk earthworks and cut/fill
02

Structural frames

Reinforced concrete, steel and cross-laminated timber, self-delivered.

Typical scope

  • In-situ reinforced concrete
  • Structural steel to 3,000t
  • CLT and glulam frames
  • Precast stairs and planks
03

Groundworks

Piling, substructure, remediation and enabling works on constrained sites.

Typical scope

  • CFA and driven piling
  • Contaminated land remediation
  • Basement and retaining structures
  • Temporary works design
04

Fit-out

Commercial, education and healthcare fit-out to CAT A and CAT B.

Typical scope

  • CAT A and CAT B
  • Healthcare to HTM standards
  • Laboratory and clean spaces
  • MEP coordination
05

Refurbishment

Listed and occupied buildings, including phased handover.

Typical scope

  • Grade I and II listed
  • Live, occupied environments
  • Phased sectional completion
  • Facade retention
06

Design & build

Single-point responsibility from RIBA Stage 2 through to handover.

Typical scope

  • RIBA Stage 2 onwards
  • Two-stage open book
  • Full design team novation
  • Single-point responsibility

Directly employed

Site operatives
214
Site management
38
Engineers & QS
29
Apprentices
17

Owned plant

360° excavators
31
Dumpers & rollers
44
Piling rigs
6
Tower cranes
9

Carbon & waste

2032

Net zero, scopes 1 & 2

98.4%

Waste diverted from landfill

71%

Plant on HVO or electric

-34%

Embodied carbon vs 2019

Bring us in at stage two.

Early contractor involvement is worth more than a competitive tender on most schemes. We will price it either way — but the buildability advice is free before the drawings are frozen.

Start a conversation