Skip to content
CHAS ELITE ISO 9001 / 14001 / 45001 CONSTRUCTIONLINE GOLD RIDDOR 0.0 — 3 YRS

Principal Contractor · CHAS Elite

We build the things that have to stand up.

Civil engineering, structural frames and design-and-build across the Midlands and South West. Self-delivered groundworks and frame, which is why our programmes hold.

Site works in progress

Beacon Quarter, Block C

ON SITE

Performance — year ending 2025

£180m

Delivered 2025

0.0

RIDDOR rate, 3 yrs

96%

On or ahead of programme

Schedule 01

Current & recent works

Full schedule →
Current and recently completed projects
Ref Project Client Value Status
GW-2025-001 Kingsway Viaduct

Replacement of a 1960s deck over a live rail corridor, in 14 possessions.

National Highways £42m Complete
GW-2026-002 Beacon Quarter, Block C

218 residential units, CLT frame above a two-storey concrete podium.

Northbank Developments £61m On site
GW-2024-003 Severn Water Treatment

New filtration hall and 12,000m³ of retained earthworks.

Severn Trent £28m Complete
GW-2024-004 Ashfield Secondary

1,200-place school delivered in 68 weeks to Net Zero in operation.

Dept. for Education £19m Complete
GW-2026-005 Dock Road Logistics

34,000m² distribution shed with 15m eaves and a 3MW roof array.

Meridian Industrial £23m On site

Schedule 02

Self-delivered capability

01

Civil engineering

Highways, bridges, drainage and deep earthworks across the Midlands and South West.

02

Structural frames

Reinforced concrete, steel and cross-laminated timber, self-delivered.

03

Groundworks

Piling, substructure, remediation and enabling works on constrained sites.

04

Fit-out

Commercial, education and healthcare fit-out to CAT A and CAT B.

05

Refurbishment

Listed and occupied buildings, including phased handover.

06

Design & build

Single-point responsibility from RIBA Stage 2 through to handover.

Health & safety

0.0

RIDDOR reportable rate
Three consecutive years

We stop work for things other contractors would carry on through. It costs us programme occasionally and it has never once cost us a job — clients would rather explain a two-day delay than an incident.

1,240

Toolbox talks, 2025

100%

Operatives CSCS carded

48h

Near-miss close-out

Got a scheme that needs pricing?

We return a considered price in ten working days, with the qualifications set out plainly rather than buried in an appendix. We will also tell you if we think the scheme is undeliverable to programme, which not every contractor does at tender stage.

Submit an enquiry